Termite protection that fits the programme and survives handover.

Termipore goes in between the PCC and the floor finish. Done right, it's a short, contained activity that gives your buyers protection they can maintain without ever lifting a tile.

Where it sits

Sequencing on site

01 · Substructure

Plinth & PCC complete

The installer lays and clamps pipe on the PCC or in soil at plinth level.

02 · Protect

Cover before screed

Sand or paper over the pipe. Wet cement must never touch it.

03 · Walls

Fix junction boxes

Boxes set in the walls at the agreed points, connected with brass fittings.

04 · Charge

Inject and record

Termiticide injected through each box before handover, with zones and pipe sizes documented.

For your site teams

What causes failures on site.

  • Wet cement on the pipe. Dried cement seals the micro-holes. Cover before pouring.
  • Kinks and tight turns. Keep to the bending radius; use elbows at corners.
  • Cut or crushed runs. Later trades chasing services through the slab must avoid marked pipe zones.
  • Look-alike pipe. Check the QR code on every roll delivered to site.
For developers

A feature buyers can understand.

  • Visible at handover. Junction boxes show the protection is built in, not promised.
  • No disruption to occupants. Re-treatment happens from the wall in apartments, offices and homes.
  • Long working life. 30–50 years when concealed, in line with the building it protects.
  • Manageable by facilities teams. A scheduled re-injection replaces emergency drilling treatments.